Project Overview:
This electrical project is for a factory in Bulgaria, completed in 2024. The primary goal is to establish a reliable and efficient power distribution system.
Equipment Used:
1. Power Transformer:
- Model: 45
- Features: High efficiency, durable construction, and reliable performance for industrial use.
2. Distribution Panels:
- Advanced control panels designed for comprehensive power management and monitoring.
Key Highlights:
- Installation of high-efficiency transformers to ensure stable power supply.
- Utilization of advanced distribution panels for optimal energy management.
- Focus on safety with robust installation and protective measures.
This project illustrates the integration of cutting-edge electrical solutions to support the operational needs of a modern industrial facility.