Project Overview:
This hydropower project is located in West Java, Indonesia, and was initiated in March 2012. The project aims to harness the hydroelectric potential of the region to generate sustainable energy.
Equipment Used:
Power Distribution Panels:
High Voltage Switchgear Panels (HXGN-12, NP-3, NP-4)
Generator and Transformer Interconnection Panels
Transformers:
Main Transformer (5000kVA, Unit-1) with advanced cooling and protection systems.
Safety and Monitoring:
Comprehensive safety warnings and protective fencing around high-voltage equipment.
Integrated monitoring and control systems for efficient operation.